
Table of contents
3.1 Transport and Unpacking 13
3.1.1 Transport 13
3.1.2 Unpacking 13
3.2 Installation of the PC into the 19-inch Rack 14
3.2.1 Preparation of the control cabinet 14
3.2.2 Earthing measures 15
3.3 100-240 V
AC
Power Supply 16
3.3.1 Mains Socket and Main Switch 16
3.3.2 Power supply cords 16
3.4 24 V
DC
Power Supply (optional) 17
3.4.1 Beckhoff power supply technology 17
3.4.2 Pin assignment of the connector for the power supply 18
3.4.3 Fitting the cable 19
3.4.4 Connecting Power Supply 20
3.5 Connecting the Industrial PC 22
3.5.1 Connecting cables 22
3.5.2 Check voltage rating and connect 22
4 Operating Instructions 23
4.1 Switching the Industrial PC on and off 23
4.1.1 Switch on 23
4.1.2 Shutting down and switching off 23
4.1.3 First switching on and driver installation 23
4.2 Servicing and maintenance 24
4.2.1 Cleaning of the Industrial PC 24
4.2.2 Maintenance 24
4.2.3 Replacing the Battery on the Motherboard 24
4.3 Emergency procedures 24
4.4 Shutting down 24
4.4.1 Disposal 24
5 UPS Software Components (optional) 25
5.1 Installation on the PC 25
5.2 Help files 25
6 Troubleshooting 26
7 Assembly dimensions 27
8 Technical Data 29
9 Appendix 30
9.1 Beckhoff Support and Service 30
9.1.1 Beckhoff branches and partner companies 30
2 C5210
Commentaires sur ces manuels